Torre Americas 1500
In April 2017, the Mexican firm Sordo Madaleno Arquitectos completed a new tower that stacks offset volumes. Torre Américas 1500, located in Guadalajara, is the first building to be completed as part of a complex which is emerging as a key area for Mexican architecture.
The mixed-use tower consists of four stacked geometric volumes. Two of these are slightly offset, but aligned on the rear face. These gestures of displacement are designed to interrupt the robustness of the building and express a sense of movement. The lowest volume houses a hotel, and the three volumes above are allocated to office use.
As a response to its urban context, adjacent to one of the city’s most significant highways, the building's façade resembles a double skin, enveloping it for its protection.
The solar gain the building will receive on three of its four sides was one of the most significant design challenges. For this reason, the faces include recessed aluminium framing, designed to create shading. In addition, the building has double glazing with a high degree of solar protection. As a result, it is the first building of this type in the west of the country to receive LEED certification.
Torre Américas 1500 is located on a site of 4,116 m², with a built area of 29,461 m² distributed over 26 floors. There are 7 basement levels, and the structural design is based on post-tensioned concrete slabs and a central circulation core.
Content and images courtesy of Sordo Madaleno Arquitectos.
Images © Rafael Gamo.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.




























